Boeing

Seattle Boeing Company

Allied installed a 36” liner at Rogers Pass, Montana right after the first winter snow hit.  To start the project off Allied had to work with bypassing a creek that was running through the culvert. The line included a 22-degree angle change. Due to the location of the pipe heavy equipment was needed to position the liner to allow for a smoother pull-in process.

Other Projects

Emergency Repair

Erosion had caused a large void under the sewer infrastructure

Slip Lining

We routed a new high-pressure HDPE through a failing steel line. Replaced about 400’ of irrigation line under yards, fences, driveway way, and a cul-de-sac.

6" Repair and Lining

A 600' long 6" diameter cast iron pipe under an active factory and cleaned 27 connecting laterals.